If your flooring runs parallel with the door you ll likely have only one piece of laminate to trim.
Laminate flooring exterior door threshold.
However doors create open termination points where the laminate needs a transition point.
When you re installing a laminate floor finishing the floor to other areas such as adjoining rooms and outside doors is a vital part of the installation process.
How is this normally handled.
The transition pieces are only for interior doorways.
Once you trim the door jamb to the proper clearance you ll want to measure and mark the piece or pieces of laminate going through the threshold.
Measure and mark threshold flooring pieces.
If a laminate floor is not finished correctly the expansion gap may be compromised or the seal of the floor may be gapped allowing the floor to buckle or warp and voiding the.